Lincoln Tunnel

OpenBuildings

The Lincoln Tunnel is a 1.5-mile (2.4 km) long tunnel under the Hudson River, connecting Weehawken, New Jersey and the borough of Manhattan in New York City.

History
The tunnel was designed by Ole Singstad. The project was funded by the New Deal's Public Works Administration. Construction began on the first tube in March 1934. It opened to traffic on December 22, 1937, charging $0.50 per passenger car. The cost of construction was $85,000,000. The original design called for two tubes. Work on the second was halted in 1938 but resumed in 1941. Due to war material shortages of metal, completion was delayed for two years. It opened on February 1, 1945 at a cost of $80 million, with Michael Catan, brother of Omero Catan (known as Mr. First, attending over 526 opening day events), selected to be the first to lead the public through the tube. A third tube was proposed by the Port Authority due to increased traffic demand but initially opposed by the City of New York, which was trying to get the Port Authority to help pay for the road improvements that the City would need to handle the additional traffic. Eventually a compromise was worked out and the third tube opened on May 25, 1957 to the south of the original two tunnels. Although the three portals are side by side in New Jersey, in New York City the north tube portal is one block west of the other two, which emerge side by side at Tenth Avenue between 38th & 39th Streets.

Tubes

Traffic
The three tubes carry six traffic lanes in total. During the morning rush hour one traffic lane in the center tube called the XBL (Exclusive Bus Lane) and is only used by buses. The New Jersey approach roadway, locally known as The Helix, spirals in a full circle before arriving at the toll booths in front of the tunnel portals. In Manhattan, Dyer Avenue and the Lincoln Tunnel Expressway serve as the primary egress roadways for the Lincoln Tunnel. Each of the travel lanes in the tunnel's center tube is reversible. In general, both of the lanes serve Manhattan-bound traffic during the weekday morning rush hour, both of the lanes serve New Jersey-bound traffic during the weekday evening rush hour, and one lane is provided in each direction during other time periods. The tunnel carries almost 120,000 vehicles per day, making it one of the busiest vehicular tunnels in the world. The XBL is by far the busiest and most productive bus lane in the United States. The lane operates weekday mornings between 6:15 and 10:00 a.m., accommodating approximately 1,700 buses and 62,000 commuters, mainly to the Port Authority Bus Terminal. The high ridership on the XBL is higher than New Jersey Transit's commuter rail into Penn Station. Normally only motor traffic uses the tunnel, but every year a few bicycle tours and foot races pass through by special arrangement.

Route numbers
With the cancellation of the Mid-Manhattan Expressway, intended to carry Interstate 495 through New York City to the Queens-Midtown Tunnel and onto the Long Island Expressway, the NYSDOT and NJDOT demoted the Lincoln Tunnel, Queens-Midtown Tunnel, and the freeway link to NJ 3 as state routes. Some signs still list the tunnels as I-495. Although the Federal Highway Administration still considers the Midtown Tunnel to be an Interstate, the Lincoln Tunnel is no longer on the Interstate system. In New Jersey, the freeway was officially demoted to NJ 495 and very few signs still read "I-495". 34th Street links the disjointed segments of I-495.

Notable Incidents
Shortly after noon on September 8, 1953, two armed men, Peter Simon and John Metcalf, attempted to rob a home in South Orange, New Jersey. The men were driven off by the residents, one of whom reported the license plate on their car to the police, who put out an alert. A patrolman, Nicholas Falabella, noticed the car just as it passed the toll booth and ordered the driver to stop the vehicle. The driver sped off into the tunnel, firing at the police. A Port Authority policeman, Donald Lackmun, was hit in the leg. The police commandeered a delivery truck and gave chase, exchanging gun fire with the renegade car while weaving in and out of traffic. In all 28 shots were fired, ten by the gunmen and 18 by the police. The vehicle came to a stop about three fourths of the way through the tunnel. Simon was hit in the head.

Name Opening year Length Comments Lincoln Tunnel south tube: 1957 center tube: 1937 north tube: 1945 south tube: 2,440 m (8,006 ft) center tube: 2,504 m (8,216 ft) north tube: 2,281 m (7,482 ft) NJ 495/ I-495

Full article

OpenBuildings - OpenBuildings is a searchable archive of buildings from across the globe including historic, contemporary or conceptual architecture.

Shared via Field Trip, the mobile app that allows you to rediscover the world around you. Available now for iOS and Android.